Project Description:
Design/build commercial. Install high-pressure steam boilers, a deaerator and associated piping that provides steam for cleaning laboratory equipment.
Project Equipment:
Two 50 HP Fulton boilers with Webster full modulating gas and oil burners. One Shipco single-compartment deaerator with duplex Grundfos boiler feedwater pumps.
Project Design Notes: This project was a design/build project in which D&D Plumbingwas responsible for designing and installing the system in order to provide up to 2,658 lbs/hr of 80 psi steam. The system was designed to meet the UMC, ASME Power Piping Codes and the Nevada Boiler Codes. The project was a success and has been in operation since July of 2003.
The picture below shows the two Fulton boilers with the deaerator in the background.